Thursday, Aug. 31

IDOT giving motorists a break during Labor Day weekend          Send a link to a friend

Working to make the roads as safe as possible by opening up lanes and cracking down on impaired drivers

[AUG. 31, 2006]  SPRINGFIELD -- Illinois Department of Transportation Secretary Timothy W. Martin announced that the department will suspend construction and open lanes where possible during the Labor Day holiday to ease the flow of traffic and congestion during the long travel weekend. Martin also reminded motorists that the Department of Transportation is working with the Illinois State Police, local agencies and Mothers Against Drunk Driving on the most aggressive Labor Day campaign ever, targeting impaired drivers throughout the state. [Related article]

"Labor Day weekend is a time for families to get together and enjoy the last holiday weekend of the summer, so we want to give our construction workers a break, but also we want to open as many lanes of traffic as possible to make for a smooth commute during this busy travel holiday," Martin said. "Unfortunately, last year Labor Day was our deadliest holiday, averaging more than five deaths per day on our roads. We'll have 1,600 special patrols during our Labor Day mobilization, where police will be placing special emphasis on getting impaired drivers off the road."

The Department of Transportation is in the middle of a 17-day Labor Day enforcement and education campaign, joining with Mothers Against Drunk Driving, Illinois State Police and local law enforcement in targeting impaired driving. Statewide, 250 agencies will team up to conduct more than 220 roadside safety checks and nearly 1,400 saturation patrols.

"Holidays are a time when people get caught up in the festivities and make bad decisions," said Susan McKinney, executive director of MADD Illinois. "That's why MADD is joining forces with America's law enforcement and highway safety officials to send a clear message to drivers: If you drive drunk this Labor Day, you will be arrested. No exceptions. No excuses."

Various construction zones will be open for Labor Day weekend from 3 p.m. Friday through midnight Monday. However, due to the nature of some projects, there will be construction zones throughout the state that will continue to operate. The Department of Transportation is urging motorists to slow down and drive with caution through these work zones. Holiday travelers are reminded that work zone speed limits are still in effect.

Motorists are advised to check www.illinoisroads.info for information regarding road conditions and updates on road construction. Interstate road condition information is also available at 1-800-452-IDOT (4368).

In the greater Chicago area, all lanes on the Edens, Eisenhower, Kennedy, Stevenson, Dan Ryan and Bishop Ford expressways, as well as interstates 80 and 57, will be open wherever possible.

Areas that will continue to have lane closures are as follows:

Bureau County

I-80 from milepost 56 to 61 -- Median work. One lane open.

Backbone Road over I-80 -- Road closed.

New Bedford Road one-half mile west of Illinois 40 -- Bridge replacement. Road closed.

Clay County

U.S. Route 45 north of Louisville -- One lane open for bridge work.

Cook County

Bishop Ford in South Holland -- Two lanes each direction from 159th to I-80. Ramp from southbound Ford to eastbound Kingery reduced to one lane. Ramp from southbound Ford and eastbound I-94 to westbound I-80 and the northbound I-294 TriState Tollway closed with detour posted.

I-394 reconstruction in Thornton and Lansing -- One lane in each direction between Glenwood-Lansing Road and I-80. Ramp from westbound I-80 to southbound I-394 will be closed with detour posted.

Kingery reconstruction in Lansing, Thornton, South Holland, Hammond and Munster -- Three lanes in each direction, with some narrow lanes and lane shifts from U.S. 41 and Calumet Avenue in Indiana to I-94. Two lanes in each direction from I-94 to the I-80-294 Tri-State Tollway. Ramp from eastbound I-80 and southbound I-294 to westbound I-94 and Bishop Ford closed with detour posted. Eastbound I-80-94 to southbound U.S. 41 and Calumet Avenue closed with detour posted. Ramp from westbound I-80 to southbound I-394 will be closed with detour posted.

Dan Ryan Expressway reconstruction in Chicago -- One express lane in each direction is open during the next two weeks. Three lanes open in both directions from 99th Street to 12th Street. From 71st to 95th the outside lane will be closed in both directions. Northbound and southbound express lanes closed from 69th to 31st Street, with local lanes open to traffic. Left lane closures on State from 71st to 95th and on Lafayette from 75th to 95th and on 98th Place from Eggleston to Parnell. The 76th Street bridge will be closed. The Root Street bridge will be closed.

Dan Ryan Expressway patching in Chicago, which began July 3 --- One lane open in westbound direction on 87th Street from Western to Kedzie (Lane 1).

Dan Ryan Expressway reconstruction in Chicago -- Southbound 59th Street exit and northbound 59th entrance ramps are permanently closed. Southbound and northbound 51st Street exit and entrance ramps are permanently closed. Full closure of southbound Roosevelt entrance ramp at Union Avenue. Full closure of northbound I-55 to westbound I-90-94 entrance ramp. Full closure of northbound 63rd Street entrance ramp. Full closure of northbound 95th Street entrance ramp. Full closure of northbound 87th Street exit ramp. Full closure of northbound 87th Street entrance ramp. Full closure of northbound 79th Street entrance ramp and northbound 76th Street exit ramp. Full closure of southbound 95th exit ramp. Full closure of southbound 87th entrance ramp. Full closure of southbound 76th Street entrance ramp and southbound 79th Street exit ramp. Full closure of 76th Street bridge. Westbound right lane of the 67th Street bridge over the Dan Ryan is closed. There will be access to temporary ramps.

Skyway interchange and Dan Ryan from 67th to Wentworth Avenue -- Reconstruction in Chicago. All local lanes open. Temporary daily lane closures for punch list work. Work will continue on State Street under the Skyway eastbound and westbound ramp bridges at 66th Street.

Maple Avenue and Chicago Avenue from Cumnor Road to Route 83 -- Reconstruction in Clarendon Hills and Westmont. Eastbound traffic closed for the duration of project. Westbound traffic only. Eastbound traffic follows a posted detour route.

Route 56 and Butterfield Road from U.S. 12-20-45 to St. Charles Road -- Widening and resurfacing in Bellwood. One lane in each direction.

U.S. 20 and Lake Street from Route 53 to Addison Road -- Reconstruction in Addison. One lane in each direction.

Grand Avenue relocation of two IHB railroad tracks 1,000 feet east to share the right of way with CN and cross Grand Avenue at a single location on a new three-track bridge over a new depressed roadway in Franklin Park -- One lane in each direction. Detour posted.

McCormick from Emerson Street to Green Bay Road -- Roadway reconstruction in Evanston. One lane in each direction.

Walnut Lane from Schaumburg Road to Bode Road -- Reconstruction in Schaumburg. One lane in each direction.

Nagle Avenue over I-90 -- Bridge reconstruction in Chicago. One lane in each direction

Devon Avenue at Tonne Road and Wood Dale Road -- Widening and resurfacing in Elk Grove Village. Two lanes each direction, with turn lanes at the intersection of Devon Avenue and Wooddale and Tonne roads.

Southwest Highway from 135th to 143rd streets -- Reconstruction in Orland Park. Road is closed.

Crawford County

Route 33 south of Palestine -- One lane open for bridge work.

Effingham County

Southbound I-57 north of Effingham milepost 165 -- One lane open for bridge work.

Fayette County

U.S. 51 south of Vandalia -- One lane open for bridge work.

Fulton County

U.S. Route 24 near Duncan Mills -- New bridge construction. One lane open, controlled by signals.

Route 9 near Fiatt -- New bridge construction. One lane open, controlled by signals.

Grundy County

I-80 at milepost 105 -- Seneca interchange closed. Detour posted.

Ashley Road over I-80 -- Road closed. Detour posted.

Hancock County

U.S. 136 four-lane bridge between Hamilton and Keokuk, Iowa -- One westbound and one eastbound lane closed for bridge painting.

Henry County

Osco Road bridge over the Green River one mile north of Route 81 -- Bridge deck replacement restricts traffic to one lane controlled by traffic signals.

Iroquois County

Old Route 45 between Clifton and Chebanse -- Bridge deck replacement. Road closed. Detour posted.

Route 49 five miles south of U.S. 24 -- Bridge deck replacement. One lane open, controlled by signals.

Jo Daviess County

U.S. 20 bridge over the Apple River two miles west of Elizabeth -- Bridge deck replacement restricts traffic to one lane controlled by traffic signals.

Route 78 bridges at Plum River and at Davis Creek south of Stockton -- Traffic is controlled by temporary traffic signals at both locations while the structures are replaced, half at a time.

[to top of second column]

Lake County

Deerfield Parkway reconstruction east of Route 83, widening of intersection of Deerfield Parkway and Buffalo Grove Road, and widening of intersection of Deerfield and Weiland -- Roadway reconstruction and widening in Buffalo Grove. One lane in each direction.

Route 22 and Half Day Road from Route 83 and Mundelein Road to U.S. 45 and 21 -- Roadway reconstruction in Buffalo Grove, Long Grove and Lincolnshire. One lane in each direction, with turn lanes at intersections. Tight right-turn radius at Prairie Road and Main Street on Route 22.

Route 22 west of Bueshing Road to Quentin Road -- Roadway widening and reconstruction in Lake Zurich. One lane in each direction, with turn lanes at intersections.

Route 22 from Beusching to Quentin Road -- Roadway widening and reconstruction in Lake Zurich. One lane in each direction, with turn lanes at intersections.

Route 83 over the Wisconsin Central Ltd. Railroad/EJE -- New bridge deck in Lake Villa, Loon Lake and Antioch. Two narrow lanes open in each direction. Wide load not accessible

LaSalle County

Route 251 over I-80 -- Bridge repairs. One lane open in each direction.

Route 71 one-half mile east of Route 351 -- Bridge replacement. Road closed. Detour posted.

I-39 from milepost 41 to milepost 42 -- Overhead bridge painting. One lane open in each direction.

Livingston County

I-55 at milepost 203 -- Overhead bridge painting. One lane open in each direction.

Route 116 three miles west of Illinois 47 -- Bridge replacement. One lane open, controlled by signals.

Route 23 three miles south of Illinois 17 -- Bridge deck replacement. One lane open, controlled by signals.

Logan County

Old Route 121 at Kickapoo Creek, just north of Lincoln -- Staged bridge construction. One-lane traffic controlled by temporary signals.

Madison County

Motorists will encounter staged construction with temporary traffic signals along Route 160 just south of Grantfork. This lane restriction is necessary to replace the existing bridge. Work to replace the bridge is expected to be completed by fall.

Motorists will encounter staged construction with temporary traffic signals along Illinois Route 4 just north of the intersection with Route 143 near Marine. This lane restriction is necessary to replace the existing bridge over Silver Creek. A signed wide-load detour is in place to direct the traveling public. Work on the bridge is expected to be completed by Nov. 30.

Motorists will encounter staged construction with temporary traffic signals along Route 4 just south of the intersection with U.S. Route 40 near St. Jacob. This lane restriction is necessary to replace the existing bridge over Lake Fork Creek. A signed wide-load detour is in place to direct the traveling public. Work on the bridge is expected to be completed by Nov. 30.

Meridian Road at the intersection of Route 157 in Glen Carbon will be closed. A marked detour is in place to aid motorists during the construction. The road is closed to reconstruct the intersection associated with the widening of Route 157 project. Work is expected to be completed by Sept. 30.

Marion County

Motorists will encounter staged construction with temporary traffic signals on U.S. Route 50 approximately two miles and three miles west of the Clay County line. These lane restrictions are necessary to replace the bridges over Skillet Fork and Dums Creek. Work on these structures is expected to be completed by the summer of 2007.

McHenry County

U.S. 14 at Mokeler Creek to north of Route 173
-- Widening in Harvard. Traffic is shifted to the west side of the bridge, with one lane open in each direction.

U.S. 14 over Lawrence Creek -- Box culvert replacement in Big Foot. Traffic is shifted to the right side of the bridge, with one lane open in each direction.

McLean County

Illinois Route 9 eight miles east of Bloomington -- Bridge rehabilitation. Traffic controlled by temporary traffic signals.

Montgomery County

Route 185 1.3 miles southeast of Coffeen over East Fork of Shoal Creek -- Staged bridge construction. One-lane traffic controlled by temporary signals.

SBI 16 and U.S. 66 northbound lanes from south of Litchfield at 10th Street and TR 1000N to Route 16 in Litchfield -- Northbound traffic will be detoured to Old U.S. 66 at 10th Street.

Peoria County

I-74, Exit 89 at War Memorial Drive -- Westbound and eastbound entrance and exit ramps closed. Motorists should use Exit 88 at Sterling Avenue as an alternate route.

I-74, Exit 90 at Gale Avenue -- Westbound entrance and exit ramps closed for pavement reconstruction.

I-74, Exit 91 at University Avenue -- Westbound entrance ramp closed for pavement reconstruction.

I-74, Exit 92 -- Westbound entrance and exit ramps at Glendale closed for pavement reconstruction.

Putnam County

I-180 over the Illinois River -- Bridge repairs. One lane open in each direction.

Rock Island County

Route 92 bridge east of Andalusia -- Bridge deck replacement restricts traffic to one lane controlled by traffic signals.

U.S. 67 bridge over the south channel of the Rock River -- Traffic is restricted to one lane in each direction as repairs are made to the bridge joints.

Sangamon County

Old U.S. 36 and Camp Butler Road at Riverton -- Closed to replace three structures.

St. Clair County

Staged construction along Route 157 near I-64 reduces the number of lanes from two to one lane in the southbound direction and will be in place until fall.

Staged construction along Illinois Route 163 2.5 miles north of Millstadt -- Removal and replacement of the bridge over Prairie DuPont Creek will be completed in two stages, with temporary traffic signals in use. Work on the bridge is expected to be completed by Nov. 30.

Tazewell County

I-74, Exit 95A at Main Street -- Westbound entrance ramp closed for pavement reconstruction.

I-74, Exit 95B at Camp Street -- Westbound entrance ramp closed for pavement reconstruction.

I-74, Exit 96 at Washington Street -- Westbound entrance and exit ramps closed for pavement reconstruction.

Route 29 -- One lane closed southbound and northbound for pavement rehabilitation.

Vermilion County

U.S. Route 136, East Main Street in Danville -- Road reconstruction work continues. One-lane traffic in each direction will be maintained.

Whiteside County

Route 40 bridges over Winnebago Ditch one mile north of Deer Grove and over the Green River one mile south of Deer Grove -- Bridge deck replacement restricts traffic to one lane controlled by temporary traffic signals at both locations.

U.S. 30 bridge over the Mississippi River -- The crossing is closed to allow for complete replacement of two approach structures. Traffic is detoured one mile north on Route 84 to use the Route 136 bridge over the Mississippi to Iowa.

Route 84 bridges over Cedar Creek and over Spring Creek approximately one mile north of Albany -- Traffic is controlled by temporary traffic signals at both locations while the structures are replaced, half at a time.

Will County

U.S. 30 and Lily Cache -- Bridge and intersection reconstruction and widening in Plainfield. One lane in each direction.

U.S. 30 from Essington to Larkin -- Reconstruction in Crest Hill and Joliet. One lane in each direction.

Winnebago County

Route 173 is closed at the I-90 overpass to allow for construction of a new interchange. Route 173 is detoured around the work area on Route 251, Swanson Road and Belvidere Road.

[Illinois Department of Transportation news release]


< Top Stories index

Back to top


 

News | Sports | Business | Rural Review | Teaching & Learning | Home and Family | Tourism | Obituaries

Community | Perspectives | Law & Courts | Leisure Time | Spiritual Life | Health & Fitness | Teen Scene
Calendar | Letters to the Editor