City of Lincoln annual report for wastewater treatment facility and
sewer management
Send a link to a friend
[May 27, 2008]
City of Lincoln annual report
for the wastewater treatment facility and sewer management, as
submitted by Dave Kitzmiller, Environmental Management Corp.:
|
Collection System
-
4 forcemain breaks
were repaired
-
A cross connection
between the storm sewer and combined sewer flowing to the Union
St. lift station was eliminated
-
A sewer collapse
at Union and Clinton was repaired
-
The Department
received 990 utility locating requests, averaging 82 requests
per month
-
89,196 feet of
sewer line was cleaned
-
4,178 feet of
sewer line was cleaned
-
A modular aluminum trench shoring
system was purchased
Treatment Facility
-
The facility's
NPDES permit was renewed
-
The City received
39.5 inches of precipitation
-
Facility treated
just shy of 1.5 billion gallons of wastewater and just under 104
MG of storm water
-
Average a 96%
removal rate for CBOD5
-
Average a 89%
removal rate for TSS
-
Average a 99%
removal rate for Nh3-N
-
There were 9 CSOs
from Union St
-
There were 12 CSOs
from the WWTF
-
4 new CSO programs
were drafted
[to top of second column]
|
-
The lab building's
roof was replaced
-
The diffusers in
both sludge storage tanks were replaced
-
The bar screen was
repaired
-
One half of the
electrical capacitors and clamping devices were installed
-
The Kubota lawn
tractor was replaced
-
A pickup truck was purchased
Safety
-
EMC held a
company-wide , 10 hour OSHA training class
-
Performed monthly
training on 19 topics
-
EMC has worked 9.5 years without a lost
time accident
[Text copied from file received from
Dave Kitzmiller, facility manager, Environmental Management Corp.]
|