Logan County Board
September 2014 Road and Bridge Meeting

Send a link to a friend  Share

[February 19, 2015]  LINCOLN - Blue Room, Logan County Safety Complex, September 8, 2014

Present: Andy Anderson; Bob Farmer; Rick Aylesworth; Dave Blankenship; Gene Rohlfs; Chuck Ruben
Absent:  --
Guests: Bret Aukamp; Curt Fox

Mr. Anderson called the meeting to order at 7:30 pm.

A motion was made by Mr. Rohlfs, seconded by Mr. Ruben, to approve the minutes from the August 4, 2014 meeting as printed. Motion passed.

The list of claims for payments was reviewed. A motion was made by Mr. Aylesworth, seconded by Mr. Ruben to approve the list of claims for payment. Motion passed.

 

 

Monthly report on current maintenance and construction:

Mr. Aukamp reported sealcoat finished this year on August 26. Mr. Aukamp plans to have a full sealcoat report next month. The crew has completed several culvert projects in the Broadwell area and in the Hartsburg area. The crew is currently repairing several field entrances along 100th Avenue. Today, the crew replaced a crossroad culvert on 100th Avenue near US 136. The maintenance crew will begin mowing operations this month. The crew will mow the shoulders along the County Highways to reduce the effect of snow drifting during the winter months. The crew also will mow the areas near bridges to remove weeds and woody vegetation. During harvest season, the crew will focus on maintenance projects that will not impede traffic. The remaining culverts projects will be postponed until later in the fall. Construction Report: Mr. Aukamp reported Goodman Excavation completed a riprap project for Corwin Township. This County Aid project was approved in 2013. Mr. Aukamp will have a full report in the coming months when all of the bills have been received. Engineering Report: Mr. Aukamp reported one of the air conditions units in the Highway Department Building has been leaking The evaporator coil is deteriorated and the collection pan is rusted through, causing the condensate to leak into the downstairs break room. Mr. Aukamp is waiting on a seconded estimate before proceeding with the work. Mr. Aukamp has received one bid so far. The hydraulic vehicle lift in the shop is in need of repair. The rear hydraulic cylinder is leaking and needs to be replaced. The initial estimate was $8,600. However, Mr. Aukamp was able to locate another certified repair firm and receive a second estimate of $3,500. Mr. Aukamp was able to save the County $5,000.

Old Business:

Nicholson Road Resurfacing Project:

Section 11-00311-RS: Mr. Aukamp reported very good progress was made on the Nicholson Road resurfacing project this month. The final lift of asphalt was placed last week. Driveways, side roads, and mailbox turnouts will be paved in the next few days. Rock shoulders and pavement striping should be completed by next week.

High Speed Rail Crossing:

Mr. Aukamp reported the crew has been reviewing the various crossing improvements over the past 2 years. Outside the city of Lincoln, 11 rail crossings in Logan County have been designed for roadway improvements. In August, Mr. Aukamp received notification that, due to overall project cost, IDOT is considering changing the scope of work for the project. Of the 11 crossing, 7 would have no roadway improvement. The quad gates and detector loops would be installed, but not roadway improvements. Mr. Aukamp is very concerned about this proposal and has prepared a letter explaining his reasoning.



Sign Upgrade Program:

Mr. Aukamp reported the steel sign posts have now been delivered to all of the participating villages and township. Mr. Aukamp is still waiting on some hardware from the supplier and some material certifications. Mr. Aukamp expects to receive those very soon. Mr. Aukamp has a meeting schedule next week to explain the requirements of this program, and to explain how to install the steel sign post/anchors. The County’s crew will begin installation of the new signs this fall.

[to top of second column]

Status of Road Salt Procurement:

Mr. Aukamp reported joint purchasing was unfulfilled during the second attempt. So far, Mr. Aukamp has been unable to secure road salt for the coming winter season. Mr. Aukamp found one vendor, who will supply the County with salt, but it is non-domestic salt and they require cash up-front. Mr. Aukamp did not feel comfortable purchasing material sight unseen, especially if it is not from a standard source and without IDOT certification. Mr. Aukamp has a small amount of salt on hand, and an adequate supply of cinders. Mr. Aukamp is still contacting salt suppliers and hopes to have something secured this month.

Mechanic/Road Maintenance Position:

Mr. Aukamp reported he has begun the interview process and he is following up on some references. Mr. Aukamp hopes to have a candidate selected this month.

Highway Department Secretary Position:

Mr. Aukamp reported he received 30 resumes. Mr. Aukamp is in the process of reviewing the resumes and hopes to have a shortlist made by next week and to begin checking references. Mr. Aukamp plans to start interviews by the end of month.

Upcoming negotiations for Teamster’s maintenance contract:

Mr. Aukamp reported the current maintenance contract will expire on November 30, 2014. The committee will need to appoint members to a negotiation team. Mr. Rohlfs and Mr. Farmer agreed to be on the negotiation team. Negotiations will likely take place in September. Mr. Aukamp would like the contracts to be approved in October or November.

End of Old Business

New Business:

Engineering Services Agreement with Allen Henderson and Associates for design work on bridge replacement project on Primm Road (CH 9) over Deer Creek. Section 12-00038-06BR:

 Mr. Aukamp began negotiation on agreement with Henderson and Associates. Mr. Aukamp has been working through the estimated man-hours for the project and has been able to establish an agreement for $130,023.45. A motion was made by Mr. Ruben, seconded by Mr. Blankenship, to approve Engineering Agreement with Allen Henderson and Associates for Design work on a bridge replacement on Primm Road over Deer Creek in the amount of $130,023.45. Motion passed. Mr. Anderson will make a motion on Thursday night to the full board.

Engineering Agreement for Design work on Bridge Replacement on 100 Street for Mount Pulaski Township. Section 14-12144-00BR:

Mr. Aukamp has been working with Prairie Engineers to negotiate an engineering agreement for design work to replace a bridge for Mt. Pulaski Township. Prairie Engineers will provide the roadway and hydraulic design. Chastain and Associates of Decatur will provide the bridge design. The bridge is planned for replacement in the Fall 2015. Mr. Aukamp would like to move forward with the engineering agreement so the survey date can be collect as soon as crops are removed from the field. A motion was made by Mr. Aylesworth, seconded by Mr. Rohlfs, to approve Engineering Agreement for Design work on Bridge Replacement on 100 Street for Mount Pulaski Township in the amount of $42,030.00. Motion passed. Mr. Anderson will bring forward the motion on Thursday night.

End of New Business

Quarterly Project Status Report:

Mr. Aukamp passed out his quarterly project status report for the members to look over.

A motion was made by Mr. Ruben, seconded by Mr. Aylesworth, to adjourn the meeting. Motion passed. Meeting ended at 8:05 pm.