The walls are finished, just
waiting for painting, mechanicals are in place, ceiling grids are
being installed, and work on replacing all the windows in the
historic structure has begun. In the next week, the outside
appearance of the building will be significantly changed when the
new windows are installed, replacing the boarded-up and broken ones
that have been a part of the structure since the 2001 fire.
Pictures by Mike Fak |