Harvey may cause long-term disruption on
Houston's rail tracks
Send a link to a friend
[August 31, 2017]
By Nick Carey and Eric M. Johnson
(Reuters) - Major U.S. railroads have
warned that it could be a long time before normal operations resume in
the Houston area where Tropical Storm Harvey has caused catastrophic
flooding.
Closure of rail lines in the grain transport hub and nexus for
cross-border traffic with Mexico presents a costly headache for
customers ranging from automakers to farmers who use the lines to send
ethanol, cereals and auto parts to and from Mexico or to be loaded onto
ships.
Union Pacific Corp and Berkshire Hathaway Inc's BNSF Railway, the two
leading U.S. railroads, and regional railroad Kansas City Southern have
suspended operations in the area affected by the storm.
"We don't have a historical precedent with this one," said Thomas
Williamson, owner of Florida-based rail broker Transportation
Consultants Co. "I expect service to be disrupted anywhere from two to
six weeks."
Union Pacific, the No. 1 U.S. railroad, said that as of midday on
Wednesday, sections of track were out of service in 18 of its 28
Houston-area subdivisions, and it was sending traffic along alternate
routes through Longview and Dallas.
The railroad said it was using helicopters and drones to inspect track
and facilities in areas without road access. And it said workers were
reorganizing major rail yards at Settegast, near downtown Houston, and
Englewood, including assessing infrastructure, getting trains
reassembled and cars back in the yard.
A Midwest-based conductor at the railroad said parts of Union Pacific's
Englewood Yard were flooded as of late Tuesday.
The company, which has been rerouting rail traffic away from Houston,
said traffic entering or leaving through the north and east sides of
Houston was on hold, and its main line between Houston and San Antonio,
to the west, was out of service.
BNSF said in a Tuesday customer announcement that normal train flows in
the area were unlikely to resume for "an extended period."
A spokesman at CSX Corp, the No. 3 U.S. railroad, which has so far been
unaffected by Harvey, said on Wednesday it was "closely watching the
weather conditions in Louisiana and the southwestern portion of our
operating network."
COSTS UNKNOWN
Loadings of wheat, corn and sorghum onto ships for export have been
halted in Texas. And although coastal grain elevators have not been
significantly damaged they have been unable to receive supplies.
Archer Daniels Midland Co's grain elevators remained operational in
Corpus Christi and Galveston, Texas, but loadings there cannot resume
until rail transportation begins again, a spokeswoman said.
[to top of second column] |
Train engines stand still on tracks in Orange, Texas, U.S., on
August 30, 2017. REUTERS/Jonathan Bachman
Louis Dreyfus Co, [AKIRAU.UL] which has grain terminals in Beaumont
and Houston, did not return requests for comment on Wednesday.
Kansas City Southern, with much of its business focused on
U.S.-Mexico trade, may have greater exposure to disruption caused by
the storm than the other two railroads, Cowen & Co analyst Jason
Seidl said in a note to clients.
Kansas City Southern said on Wednesday its lane between Houston and
Laredo on the U.S.-Mexico border remained closed, but it said its
infrastructure so far had not been significantly damaged.
"We continue to monitor the situation, which has expanded and is now
impacting new areas on our system, namely Beaumont, Texas, and Lake
Charles, Louisiana," Kansas City Southern said in a written
statement.
Rail customers and their transportation providers will find ways to
bypass Houston, said Rick Ehrensaft, chief operating officer at
Grand Worldwide Logistics Corp, a warehouse and third-party
logistics company with locations across the United States.
"There will be some triaging using other modes of transportation to
get around anything that's been routed through there," he said.
"What that's going to do to costs is unknown."
Once the rails are up and running, railroad operators will likely
benefit as goods for recovery and rebuilding are sent to the region,
said independent railroad analyst Anthony Hatch.
"We can be sure that the rails will be quicker to recover than most
as they have been through this before," he said.
Hurricane Katrina in 2005 damaged about 200 miles (320 km) of CSX
track on the Gulf Coast, causing about $250 million in damages, 90
percent of which was covered by insurance.
(Reporting by Nick Carey in Detroit and Eric M. Johnson in Seattle;
Additional reporting by Jarrett Renshaw in New York and Michael
Hirtzer and Karl Plume in Chicago; Editing by Peter Cooney, Toni
Reinhold)
[© 2017 Thomson Reuters. All rights
reserved.]
Copyright 2017 Reuters. All rights reserved. This material may not be published,
broadcast, rewritten or redistributed. |