The existing buildings were
constructed from 1937 thru 1994 with the main part of the campus
first used by students in 1969.
The plan touches every space on
the main campus and includes a new HVAC system, fire sprinklers,
lighting, ceilings, windows and flooring. Spaces undergoing a major
remodel include the cafeteria, library, band and choir space, stage,
science labs, and offices. Additions to the school include a new
entrance and office, updated to modern security standards, new
locker rooms, a new vocational education shop and classrooms, and an
expansion of the current multi-purpose room into a practice gym.
See more details here: Athens
School Remodel Plan
http://www.athens-213.org/athens-campus-remodel |
|