I-55 bridge work in Morton begins
August 19th
Send a link to a friend
[August 18, 2024]
The
Illinois Department of Transportation announced that construction on
the Queenwood Road and Broadway Road bridges over Interstate 155 in
Morton begins Aug. 19.
The project involves replacing bridge joints and resurfacing the
bridge decks and will require lane closures on both bridges through
the end of November.
Motorists can expect delays and should allow extra time for trips
through this area. To avoid the work area, when feasible, use of
alternate routes should be considered. Drivers are urged to pay
close attention to changed conditions and signs in the work zones,
obey the posted speed limits, refrain from using mobile devices and
be alert for workers and equipment.
[Illinois Department of Transportation]
[to top of second column] |